Family owned in Gilbert, AZ · Since 2015
Orca IT Solutions

Office Move & IT Relocation

Open Monday morning with everything working

Office moves fail on lead times, not on lifting. Circuits take weeks to install, cabling has to be run before furniture arrives, and the cutover order matters. We plan backwards from your first working morning in the new space and manage the parts that cannot be rushed.

🛡 Pre-Move Survey ISP Managed Early💰 Weekend Cutovers Never Outsourced

Planning

The move starts with a survey, not a truck

Everything that goes wrong in an office move was decided months earlier, usually by nobody in particular.

The first visit is to the new space with the floor plan in hand. We work out where the communications room will be and whether it has the power, the ventilation and the physical security to be one, a closet with no airflow in an Arizona building is a server failure scheduled for July. We count the data drops each desk actually needs, map where wireless access points should go given the wall construction, check where the building's service entrance is and what conduit exists, and look for the problems that are cheap to fix now and expensive to fix later: no dedicated circuit for the rack, no path for cable between floors, a demarcation point on the wrong side of the building.

Circuits are the long pole

Internet service is the item that will delay your move, and it is the one businesses start last. A new fiber circuit at a commercial address is regularly a matter of many weeks from order to live, sometimes considerably longer if construction is required to reach the building, and the provider's survey may not reveal that until well into the process. Coax and fixed wireless are faster to install but not always suitable as a primary service. We get the order placed as soon as the lease is signed, chase the provider through the survey and scheduling stages, and get the circuit installed and tested well before move weekend.

The corresponding discipline is not canceling the old circuit too early. Overlap the services. Paying for two connections for a few weeks is a rounding error against a business that cannot process orders on its first Monday. We also plan for what happens if the new circuit is late, which sometimes means a temporary cellular failover so the office can operate while the provider finishes, and which is worth having anyway as ongoing redundancy.

Cabling, and moving the rack

Structured cabling goes in before furniture and after any building work, and it should be done properly the one time it is easy to do. That means Cat6 or Cat6A depending on your needs and horizon, plenum-rated cable where it runs through return air spaces because the fire code requires it, terminations onto a patch panel rather than loose cables into a switch, every run labeled at both ends against a schedule, and testing and certification for each drop. Untested cabling is where intermittent network faults come from, and they take longer to find later than the testing would have taken originally. Run more drops than you think you need while the ceiling is open, because the marginal cost per additional drop during installation is a fraction of adding one afterwards.

The rack itself is a documentation job before it is a physical one. Before anything is unplugged we photograph every side of the cabinet, label both ends of every cable, and produce a manifest of what connects where. Then equipment is shut down in the correct order, virtual machines quiesced, then guests, then hosts, then storage, then the network, with a verified backup taken immediately beforehand and, on anything critical, a second copy that leaves the building separately from the hardware. Equipment travels padded and upright, and drives that have run continuously for years occasionally do not come back up after being moved, which is precisely why the backup is verified first rather than assumed.

The cutover itself is a schedule, not an event, and most of it happens before the weekend. Public DNS record time-to-live values are lowered several days ahead so records propagate in minutes rather than hours when the address changes. Firewall configuration for the new circuit is built and staged in advance, including any site-to-site VPN tunnels that must be reconfigured for new public addressing. Anything published to the internet gets its new address planned and its certificate arrangements checked. Voice services are ported or reconfigured with the provider on a confirmed date, because number porting has its own lead time and its own capacity to ruin a Monday.

Then the physical weekend: equipment installed and racked, cabling patched and verified, wireless access points mounted and tuned to the new walls rather than left on defaults, printers and multifunction devices connected, addressed and tested from real workstations, and every desk brought up and checked with someone actually logging in. We work through a written checklist rather than by memory, because at eleven o'clock on a Sunday night memory is not what anyone should be relying on. Our network installation and wireless pages cover that side of the work in more detail.

Day one, we are there. Someone from your pod is onsite for the first morning, because the issues that surface are always small, numerous and urgent: a scanner that will not reach its destination folder, a label printer nobody mentioned, a user whose mapped drive points at the old server address, a conference room display with the wrong input. Being present turns a day of complaints into a morning of quick fixes. There is more on how we run these projects at officemove.orcait.io.

Order the circuit the day you sign the lease. Everything else can be compressed. That cannot.Orca IT, Gilbert AZ

How A Move Runs

Four phases, planned backwards from opening day

01

Survey

New site walked with the floor plan: comms room suitability, power and cooling, drop counts, wireless coverage, conduit paths and the building's service entrance.

02

Procure

Circuits ordered immediately, cabling scheduled around building work, hardware refreshed where it makes sense to move new rather than old.

03

Cut over

DNS values lowered ahead of time, firewall staged, equipment moved and racked over a weekend, every desk and printer verified before anyone arrives.

04

Day one

Your pod onsite for the first morning to clear the small issues quickly, followed by a punch list and a review a week later.

Moving in the next six months?

The earliest conversation is the cheapest one. We are happy to walk the space with you.

Get a Free Assessment

What We Manage

The parts of a move that are genuinely IT

Six workstreams we own so you can concentrate on the business.

Communications room

Location, power, ventilation, cabinet specification and physical security, so your equipment is not living in an unventilated closet.

Internet and voice

Circuit ordering and provider chasing, overlap planning, number porting dates and temporary failover if the new service runs late.

Structured cabling

Cat6 or Cat6A drops, plenum-rated where required, patched to a panel, labeled at both ends and tested and certified individually.

Rack and server move

Photographed, labeled and documented before teardown, verified backup taken first, shutdown in the correct order and rebuilt to the same standard.

Network reconfiguration

New addressing, firewall rules, VPN tunnels, VLANs and wireless tuned to the new building rather than carried over on defaults.

Desk and device setup

Every workstation, printer, scanner and conference room device connected, tested and signed off before the first working morning.

The move you barely notice on Monday.

IT relocation for businesses across Gilbert, Chandler, Mesa, Tempe and Queen Creek.

Talk to Your Pod

Office relocation questions

How far ahead should we start planning?

Three months is comfortable, and the internet circuit is the reason. A new commercial fiber install regularly takes many weeks, longer if construction is needed to reach the building. Everything else in a move can be compressed if necessary. That cannot.

When should we cancel the old internet service?

After the new one is live and proven, not before. Overlapping the two for a few weeks costs very little compared with a business that cannot operate on its first Monday. We plan the overlap into the budget from the start.

Can you move our server, or should we replace it?

Both are valid and it depends on its age. Equipment that has run continuously for years occasionally does not come back after being moved, so if the hardware is nearing end of life a move is a natural moment to replace or migrate to cloud. Either way we take a verified backup that travels separately.

Do we need new cabling in the new space?

Usually, and it is worth doing properly while the ceiling is open. Existing cabling in a leased space is often an unknown quantity: untested, unlabeled and terminated inconsistently. New drops are cheapest during installation and expensive to add afterwards, so we run more than the current desk count.

How much downtime will there be?

Most of our moves cut over across a weekend with no working hours lost. The equipment is down from Friday evening until Saturday or Sunday, by which point everything is tested. Longer outages usually mean the circuit was ordered too late rather than anything to do with the physical move.

What about our phone numbers?

If you are on a cloud voice platform the move is mostly configuration. If numbers need porting to a new provider, that has its own lead time and confirmed date, so we start it early and never assume it will complete on the day it is promised.

Will someone be there on our first day?

Yes. Someone from your pod is onsite for the first working morning, because the issues that surface are numerous, small and urgent. Having a technician present turns a day of complaints into a morning of quick fixes.

Can you help us evaluate a space before we sign?

Gladly, and it is the most useful time to involve us. We look at what internet services actually reach the building, where the demarcation point is, whether a suitable comms room exists, and what cabling and power work the space will need. That can change which lease you sign.

Talk to Your Pod

Signed a lease? Talk to us before you order furniture.

The circuit order is the long pole in every move. Starting it early is the difference between a smooth week and an expensive one.

(602) 677-0779

Family owned in Gilbert, AZ since 2015 · onsite across the Phoenix metro · remote support nationwide · never outsourced

Same-day response No long contracts Flat, honest pricing Five-star service

Get your free IT consultation

A few details and your pod gets right back to you, usually the same business day.

Spam-protected with a quick CAPTCHA. Your message goes straight to our team in Gilbert. We only use your details to help with your request. Never sold, never shared.